For generic product design reports, please see the links below: 

Insta-Footing Design Report

Nolan Engineering, PLLC can provide a written and Engineer stamped (Licensed in NY, CT, DE & CO) design report for any of our products that is tailored for your specific needs.  If we are not licensed in the State where you reside, you can take our report and have it reviewed/stamped by an Engineer that is licensed in your State.  

An electronic copy as well as a paper copy of the design report will be sent along with the product.  The design report can also be sent in a Word document format (upon request) if your local Engineer would like to make changes.    

View full details

A faster alternative to a formed concrete footing

Skip the Mess. Save the Time. Reduce the Installed Cost.

When the existing concrete slab and supporting conditions qualify, Insta-Footing replaces the cut-excavate-form-pour-and-wait process with an engineered steel plate installed directly on the slab.

No cutting

No saw-cutting and removing a section of the existing slab.

No excavation

No digging below the slab or hauling excavated material away.

No forming or mixing

No footing formwork, concrete mixing, or concrete placement.

No curing delay

No waiting for a newly poured footing to cure before the next step.

Compare the installation path

Insta-Footing vs. a Conventional Poured Footing

Project stepConventional footingInsta-Footing
Existing slabCut and remove concreteKeep qualifying slab in place
Below-slab workExcavate and dispose of materialNo footing excavation
ConstructionForm, reinforce as required, mix, and pourPosition and anchor the steel plate as specified
ScheduleConcrete placement and curing delayNo new-concrete curing wait
Cost driversLabor, equipment, concrete, disposal, and downtimeFewer steps can reduce total installed cost
The practical advantage: By avoiding demolition, excavation, formwork, concrete placement, cleanup, and curing time, Insta-Footing can be faster and more affordable than installing a conventional poured footing.

Qualification matters: Insta-Footing is not a substitute for every footing. The existing slab, concrete strength, slab thickness and condition, support beneath the slab, distance from slab edges, post load, and plate selection must satisfy the current design report and installation requirements.